OMICRON Online User Meeting

OMICRON Online User Meeting – Pacific, Philippines and Indonesia


Time Optimized Substation Asset Testing

Date: September 23, 2020
Start Time*: 10:00 am, AEST   |   12:00 pm, NZST   |   07:00 am, WIB   |   08:00 am, PHST
Event Duration: 04:00 hrs

Efficiency is the major goal when testing substation assets. The intention is to gather relevant and reliable diagnostic data to be able to make informed maintenance decisions. This must happen in a short time and with reasonable effort while keeping the required outages as limited as possible. In this seminar we will cover: • Safety, Reliability and Efficiency in testing

  • Safety, Reliability and Efficiency in testing
  • How to Optimize testing of Power Transformers
  • How to Optimize testing of Circuit Breakers
  • How to Optimize testing of CTs and VTs
     

Busting the Myth of Partial Discharge Testing

Date: September 24, 2020
Start Time*: 10:00 am, AEST   |   12:00 pm, NZST   |   07:00 am, WIB   |   08:00 am, PHST
Event Duration: 04:00 hrs

Partial discharge (PD) can be an early key indicator for insulation deterioration in electrical devices that are subjected to high voltage stress. PD can lead to the total destruction of the insulation materials if not detected in time. Avoid the element of surprise by measuring PD activity in MV and HV assets. Advanced electrical diagnostic measurement techniques and result analysis with detailed case studies highlighting the effectiveness of Partial Discharge measurements.

  • Three Ws of PD – What, Why and When to perform Partial Discharge Measurements
  • MPD 800 – A new era in PD measurement and analysis
  • Testing techniques of PD detection and localization in power Cables
  • Online monitoring of critical assets – Power Cables & Rotating Machines


Testing IEC 61850 Based Digital Substations

Date: September 30, 2020
Start Time*: 10:00 am, AEST   |   12:00 pm, NZST   |   07:00 am, WIB   |   08:00 am, PHST
Event Duration: 04:00 hrs

How testing techniques need to adapt the changing technology in IEC61850 based Digital Substations

  • What is a Digital Substation – IEC 61850 Concepts and Applications
  • Testing protection relays in digital substations
  • Troubleshooting in IEC61850 based substations
  • Analysing Real-Time Network Traffic
  • Substation Automation System Testing
  • Cybersecurity in Digital Substations
     

Advanced Techniques in Secondary Testing

Date: October 01, 2020
Start Time*: 10:00 am, AEST   |   12:00 pm, NZST   |   07:00 am, WIB   |   08:00 am, PHST
Event Duration: 04:00 hrs

Minimise shutdown duration by automating, efficient yet thorough testing and reporting of protection relays and other secondary testing techniques

  • Automation in Protection testing – Protection Testing Library
  • Future of Protection Testing – RelaySimTest
  • Maintenance management solution for protection systems
  • Testing reclosers – The easy way
  • Portable earth testing
  • Efficient Protection Testing for renewable energy systems
     

Mode of delivery
This session will be delivered online by Cisco Webex Event Software. Upon successful registration, you will receive the meeting information by email and will be able to join this online session with your desktop computer, tablet or mobile phone.
 

Enquiries
Please feel free to email info.australia@omicronenergy.com for enquiries.

AEST - Australian Eastern Standard Time | NZST - New Zealand Standard Time  | WIB - Western Indonesia Time | PHST - Philippine Standard Time