Get the tools you need to generate greater efficiency, get the most out of your products and create real solutions for your business in relation to high voltage asset testing, diagnositcs and management.  Our application based program will provide background theories,  testing methodologies, result analysis and online demonstrations.

During our 2 day workshop we'll cover time optimized power transformer testing, vibro-acoustic OLTC measurement, partial discharge fault locations, CVT diagnostics and more!

Each day will consist of 4 hours with 3 breaks and 5-6 presentations.

Presentation recordings will be provided to registered participants after the event.

With limited spaces available, register below to secure your place.

 


VIRTUAL SECONDARY AND PROTECTION USER MEETING
Pacific


July 12-13, 2022 | Pacific | Virtual | Free
8:00 WIB | 9:00 PHST | 11:00 AEST | 13:00 NZST*
 

Are you involved in protection design and testing? or IEC 61850 implementations, testing and Cyber Security? Then join our application based workshop where we will provide insights into different design, implementation and testing solutions in the area of protection and control.

During the course of 2 days we'll cover how to automate your protection tests and save time, Testing Adaptive differential characteristics, Converting conventional test plans to IEC 61850 Test plans, a powerful tool to test in the complex P-Q plane, how to troubleshoot your IEDs, automate your SAS testing and more!

Each day will consist of 4 hours with 3 breaks and 5-6 presentations.

Presentation recordings will be provided to registered participants after the event.

Don't miss your opputunity to fine tune your skillset and overcome challenges faced when on site.

 

 

Topics
Primary

 

Guided Work flow for primary asset testing
Time optimized power transformer testing, saving time and money
OLTC diagnostics
Time optimized circuit breaker testing
Partial discharge localization on cables
Insulation diagnostics on Rotating machines
Instrument transformer optimized testing
Ground system testing made easy

 

Topics
Secondary

 

Automate your test plan - Renewable protection example
Testing relay response to transformer internal faults with Adaptative differential Characteristics
Power Quality testing
Testing Generator Protection in PQ plane
The end of end to end testing from two ends
Multifunctional battery operated testing
Building blocks of IEC 61850
Converting your conventional test plans to IEC 61850 test plans
Trouble shooting your IEDs.
Performance testing in IEC 61850
Automating your SAS testing
Are your IEC 61850 substation cyber secure?

 


 